Measurement campaigns
We identify and calculate potential improvements by performing measurement campaigns. The installation is running parallel with the existing control system and will not interact with the control system.
Why
Based on the measurements, we elaborate an operation data in which points out possible improvements. Then the update is completed, the report is used for comparing the effect of the installation.
Benefits
The report gives you important inputs to possible improvements.
Financial
The cost of the campaign depends on the knowledge obtained. However, data is needed to point at the new lifetime strategy. Further the campaign gives a vital knowledge about the asset and the installation can be removed and installed on another turbine.
Technology
The equipment used for a measurement campaign is a parallel controller that monitors the original control and its actions.
How-to
The installation is easy and will not change the behavior of the turbine. The loss of production will be minimal.